Login  |  Register
Solutions»  For Dean Evans EMS»  EMS Scheduler September 08, 2010      Search
COMING SOON!

Streamside Solutions is currently working on a universal EMS Scheduler to work with a variety of EMS and Building Automation Systems.
(read more at EMS2HVAC.COM.)

EMS Scheduler

The EMS Scheduler is an application that provides an automatic scheduling interface between Johnson Controls’ Metasys® software and the Dean Evans Event Management Systems software (EMS®).

The Metasys® software controls the building’s air handler units (AHU’s) to maintain room temperatures during occupied times. The EMS system database contains the event information that defines the times and dates that rooms in the building will be occupied.  By interfacing these separate systems, the building environment can be optimally controlled based on actual room usage as dictated by the EMS system. 

Once a day, the EMS Scheduler will retrieve the confirmed scheduled events for the current day from the Dean Evans EMS system and automatically create temporary schedules in Metasys via Metalink DDE for the air handlers that serve the event rooms.  A daily printout can also be generated to let the facility operators know when the AHU’s are scheduled to start and stop.

The temporary schedules in Metasys® will override any regular weekly scheduling that has been programmed.  The temporary schedules are deleted automatically at midnight on the following day.

Benefits

  • Reduces labor costs for managing constantly changing schedules for the AHU’s to match the event schedules.
  • Reduces data entry errors for manually entering schedules.
  • Saves significant energy costs depending on the configuration of the AHU’s and how the AHU’s are operated.  For example, this product saved Kansas University Student Union $18,000 in energy costs and 700 hours of labor during the first year of operation.  (Individual results will vary.)

Features

  • One-time setup is sufficient to configure the interface and assign the rooms to the air handlers.
  • Scheduled times can be based on event schedules or booking schedules. 
  • Daily summary of schedules to be assigned to the air handlers can be printed automatically. 
  • Pre-start times can be adjusted for each air handling unit to start the AHU early enough before an event to ensure the temperature is comfortable. 
  • Minimum stop times can be adjusted to prevent shut down of a unit between events that are close together.

Requirements

  • Dean Evans EMS Lite 5.x,6.x, EMS Professional 9.x,10.x, EMS Enterprise 3.x,4.x
  • The EMS database must be accessible from the PMI workstation.
  • Johnson Controls Metasys® PMI software.
  • Windows 98 SE/2000/XP

User guide available for download for registered users...Click here to register now.

 


EMS Logo, EMS, EMS Professional, EMS Lite, EMS Enterprise are registered trademarks of Dean Evans and Associates, Inc.
Metasys, MSEA, PMI are registered trademarks of Johnson Controls, Inc.

 

 

 Related Links
Dean Evan EMS